Laserfiche WebLink
i' II <br />' ~. • • <br />`I~~ ~;~ <br />~ ' ~ I ~ CGLORAI)0 f1Ifl©© ~~ppA PE~ GMAT <br />_ ~ IfiSPECT~CI`l RESORT <br />~- SURFACE AND L~JDE?GROI.fm <br />} <br />~- <br />Operator: 1•lalden Coal Company <br />?e_raeittee: IJalden Coal Company <br />M:ne: Bourg Strip <br />.address: P.0. Box 37, Malden, CO 30431E <br />County: Jackson <br />Pile .vo.: C-021-(31 <br />Date: April 6, 1982 <br />T1 ~Q: <br />9:30 a.m. <br />:earlier. Cloudy, cold,breezy ~ ~ <br />Ooerater Cor.3e.: lJalt Ayres <br />State I:yscectr. Richard Domingue <br />I <br />2. General Curtments ' <br />This pia$ a partial inspection of the mine site and rail loadout f~cilit . <br />Construction of the permanent East Dump is in progress. A subs![ Ttial aM~unt i <br />of tops it has been removed in advance of the placement of ever ufden i he dump.. <br />Backfil ing operations are progressing in the mined area of Sta e l a d ~n,ne ~ <br />operatiins are removing coal from the upper seam in Stage II. ~ <br />'i <br />i <br />I <br />• i <br />i <br />i <br />i <br />. ~ ~ <br />i <br />. j ~ I, <br />I <br />WIWI~ IyyI `` VVII i <br />I'I YIII7U ~f ' i III ~ I 1. <br />