Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Petmittee/Person 9. Permit Number 10. Permit Type <br />WESTERN FUELS -COLORADO C-008-81 PP <br />2. Address 11 . Field Visit Date 12. Purpose li. SRA Present <br />PO BOX 628, MR. GUBKA 03/08/2005 O~ ^Y <br />3. City 4. State mm - dd - yyyy <br /> <br />~ 14. Permit Status 15. Site Status 16. Facility Type <br />CO <br />NUCLA <br />A^ AP <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office ;'- 18. CCIDir' 19. Land Code <br />81424- (970)864-2165 <br />140 S <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.ILA ID # 21. Stat e Abrev. 22. County Name <br /> MONTR <br />E <br />e <br />8 <br />Mi <br />N OS-00399 CO OS <br />am <br />. <br />ne <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />NEW HORIZON <br /> 125767 <br />25. Hours 26. 'gnatm•e Block 27. Reviewing Offici <br /> <br />1.0 a. Permit Review ~ (~,~/~~ ~~ <br />c <br /> St nature: 3/ ~yl~ ~ Signahire: <br />3 <br />0 b. Site Visit Titne <br />. HENRY AUSTIN H) # 116 <br />~ <br /> <br />v <br />l Ti <br />T Review Date: 3 /l`~l <br />Zf~~ <br />ra <br />e <br />me <br />12.0 c. Printed Name: <br /> mm - dd - yyyy <br />2,p d. Report Writing Date: 03/10/2005 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Cilizen Complaint Referral (non site visit) <br />Dxx._,_Oversighf RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is~when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB_..Abandoned: All surtace and underground coal mining activities have ceased and <br />operator has left the site without completing reclamatlon as defined In <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. A81.. Bond Foreiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... good Release: Reclamation completed and State Regulatory AB3.. Reclaimed Foreiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA....Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined, <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting pphose bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC,_Temporary Cesrtion: The RA has granted performance bond(s), andlor reclama- <br />nd where coal minin <br />o <br />er <br />ti <br />cessaLo <br />ursuant t <br />30 CFR 8161 4 <br />h <br />t <br />t <br />d <br />f <br />i <br />f f <br />rf <br />it <br />d <br />it <br />I <br />I <br />g <br />p <br />ave s <br />ar <br />e <br />a <br />a <br />ons <br />n o <br />m <br />ning p <br />o <br />on o <br />o <br />e <br />e <br />s <br />e <br />s <br />n progress. <br />have not begun. 817.131 b). FR.. Forfeited and Reclaimed: Forfeiture <br />A <br />l <br />d <br />i <br />C <br />l <br />rt <br />i <br />i <br />P1 <br />Ph <br />I R <br />l <br />t Ph <br />I b <br />ng: <br />P.. Active Coa <br />Pro <br />uc <br />oa <br />su <br />ace m <br />n <br />ng <br />... <br />ase <br />eas <br />elease: At <br />ase <br />ond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Sife: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surtace coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse andlor Impoundment I... Notice of Intent to Explore under 30 CFR786.26 <br />B... Underground F._ Loadingg Facility and/or Tipple J... Exempt 16 and 2!3 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Asriculhve Regulatory Enforcement Ombudsman and 10 Reeional Fairness Boards were established to receive comments fro <br />small businesses about Federal aeency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a~ene 's <br />responsiveness to small businesa If you are a small business (a business with 500 or fewer employees inchtdine those of affiliates) page I of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FA[R (]-858-734-3247). x~d:<nn«~~,nera, ~ssa <br />