My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19537
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:32 PM
Creation date
11/18/2007 9:30:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
4/17/1998
Doc Name
1ST QUARTER 1998 POND STOCKPILE & MINE SITE INSPECTION REPORTS MOUNTAIN COAL CO WEST ELK MINE PN C-8
From
MOUNTAIN COAL CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN COAL COMPANY <br />WEST ELK MINE <br />Quarterly Stockpile and/or Site Inspection Report <br />Somerset, Gunnison County, Colorado <br />Date: March 30, 1998 Quarter: Ist Quarter 1998 Rept. I of 9 <br />Location: Lower Refuse Pile (LRPI Inspector: H. Barbe <br />Features Problem Comments <br />Erosional: <br />Rills & Gullies Yes No <br />/ <br />Vegetation / <br />Other / Silt fences knocked down by melting snow and ice <br /> will be re-installed. <br />Drainage: <br />Ditches & Channels Yes No <br />/ <br />Berms / <br />Linings / <br />Temporary Structures / <br />Culverts (CMP) / <br />Other / <br /> <br />Structural: <br />Sideslopes & Stability Yes No <br />/ <br />Pile has been regraded. <br />Cracks or settling / <br />Compaction / No new lifts, so no compaction tests done. <br />Seepage / <br />Underdrains / <br />Monitoring -Survey / Survey (attached) results showed no unusual <br />Monitoring -Visual / movement. <br />Other / <br /> <br />Reclamation: <br />Seedbed Material Yes No <br />/ <br />Subsoil / <br />Vegetation / ~~~~~\\~ <br /> f G/Sr <br />1 <br />P <br />Other / F' <br />1 <br />SCli <br />! ~~~ <br /> ;~ ~_•' O ~ <br />General Compliance & Miscellaneous: <br />Signs & Markers Yes No <br />/ ~ ;6 22845 <br />r~_ ~Q <br />~ ~t, <br />- <br /> <br />Spontaneous Canbustion <br />/ • <br />r r+a ~, <br />~~ ~,n~'•;• ••.• <br />~~= <br />Roads `~ \ <br />,~ 1 SS~~N RL ETtG , <br />Other / t t * \t`~~~ <br /> <br />Additional Continents: <br />During the I st Quarter the topsoil pile was removed and placed at the NSSA. The entire top of the refuse pile was <br />graded to drain and compacted. Sediment was removed from FW-1(in preparation for lining) and was placed on the <br />east side of the pile. <br />Action Reuuired or Needed: <br />None escep[ as noted above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.