Laserfiche WebLink
Below ae carrxner~Fs on the irupaeNon. The commanls Include dlteutsion of observalbm <br />mode dufig the hnpscllon. Conrnerds abodesatbe arty ertarcemerrt actions taken <br />durlnp the Intpettion and fire tads a evkNnce wpporflrrD the enforcement action. <br />This was a partial inspection of the GEC Mine conducted by Jlm Stark. The bond for <br />this site has been forfeited and reclamation was completed by DMG. fie weather <br />was warm and cloudy and the ground was dry. <br />Although there have been several precipitation events in the past month, it does not <br />appear that any of the erosional problems at the mine (Chen's Hill and the East Pit) <br />have become any worse. The vegetative cover is still good and with the recent <br />precipitation, the site is "greening up" nicely. <br />The Duck Pond, Orphans Pit and the Loadout areas are all in good shape as well. <br />The area ~ well vegetated and, for the most part, seems to be stabilized. <br />