My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19302
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:23 PM
Creation date
11/18/2007 9:29:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
8/19/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F <br />MINE ID # OR PROSPECTING ID # M-79-195 <br />INSPECTION DATE_August 19, 1999 <br />INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclama[ion Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. An unknown volume of stockpiled overburden and topsoil has <br />sloughed offsite and onto the Henderson Industrial Park <br />property. <br />CORRECTIVE MF.ASURE3 <br />Complete the following corrective measures on or before <br />September 24, 1999 a) "pull" back the stockpiled material <br />from the permit boundary fence a distance great enough to <br />minimize any further sloughing of materials offsite, <br />b) define a setback distance from the boundary fence that <br />will be maintained for stockpiled materials throughout the <br />life of the operation, and c) submit photographs verifying <br />completion of the requested corrective measures. <br />(Page 5) <br />September 24, 1999 <br />PB or PV PB <br />TOPIC(S) OD,TS <br />
The URL can be used to link to this page
Your browser does not support the video tag.