Laserfiche WebLink
~J <br />RECLAMATION COST SUMMARY cont'd <br /> <br />sheet 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONS TRUCCION <br />Task No.~ Task Description ~ Cost 151 <br />Subtotal (H): <br />I. EARTHWORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description Cos[ <br />~ ~ <br />~ ~ <br />151 <br />Subtotal (I1: <br />____________ <br />S. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ TasY. Description ~ ~ Cos[ (51 <br />4 ~ Resp read 6],811 cu.yd. topsoil 6 beet dirt ~ $16,1]2 <br />I I <br />I I <br />Subtotal W1: 516.1]2 <br />