Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person WESTERN FUELS - Number C-008-81 Date 08/14/2002 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=No[ Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />1. 1 Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. `Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Convo] <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2 -Inspections & Certifications <br />3. 1 Siltation Structures <br />4._ Discharge Structures <br />5. Diversions <br />6. 1 Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Sveam Buffer Zones <br />C. Topsoil & Subsoil <br />1._ Removal <br />2._ Substitute Materials <br />3._ Storage and Protection <br />D. <br />Backfilling & Grading <br />L_ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7.` Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />l._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4. Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. Drainage Convol <br />2.' Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5._ Impounding S Vuctures <br />U Of E 1 <br />E. <br />F, <br />G. <br />se xp osives s <br />1. 1 BlasterCertification B 1 1) neciaa focus for blast <br />2. 1 Distance Prohibitions _ 2) <br />3. 2 B1astSurvey/Schedule - <br />4. 1 Warnings & Records _ 3) <br />5. 1 Control of Adverse Effects - <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative ................................. ........................................ <br />1. Valid Permit....._ ..................._.........._.......... ..................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3. Terms & Conditions of Permit ............... ..............................773.]7 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Con[ro] .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11(e)&8]6/817.131 <br />7. AML Rec. Fees -- Non-Respondan[ ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(x) <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections & Certifications ....... ......_... ..............._._......44(x)(10) <br />3. Siltation Structures ....................._.......... .....................................46 <br />4. Dischazge Slructures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ...................... ................................41(c) <br />8. Surface Water Monitoring ...................... ................................41(e) <br />9. Drainage--Acid -Toxic Materials ........... ................................41(f) <br />10. Impoundmen ts ........................................ ........................ _..........49 <br />] 1. Stream Buffer Zones ............................... ....................................57 <br />C. Topsoil &Subsoil ............................... ................(816/817.22) <br />1. Removal .................................................. ................................22(x) <br />2. Substitute Materials ................................. ................................22(c) <br />3. Storage and Protection ............................ .................................22(c) <br />4. Redistribution ......................................... ................_..............22(d) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... ............................ 71(11 <br />3. Surface Stabilization .............................................. .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste(RerusePiiesQmpoundments) ,,,,,($16/817.81-84) <br />1. Drainage ConVOI ................................................... ............................83(x) <br />2. Surface Stabilization ............................_................ ............................83(6) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding Structures ........................................... ................................84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />I. Blaster Certification .......................................... .................................61(c) <br />2. Distance Prohibitions ....................................... ..................................61(d) <br />3. Blast Survey/Schedule ...................................... ......._....................,...62-64 <br />4. Warnings & Records ........................................ ..............................66 & 6S <br />5. Control of Adverse Effects ............................... ......................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />I. Roads .................................................................(816/817.150-151) <br />1. Road Construction ......................................_...................................150(c) <br />2. Certification .........................................................................:............151(x) <br />3. Drainage ...............................................................................150(6)-151(d) <br />4. Surfacing and Maintenance ..................................................150(e)-151(d) <br />5. Reclamation ......................................................................................150(f) <br />J. Signs & Markers .......................................................(816!817.11) <br />1. <br />2. <br />D. Backfilling & Grading ..............................(816/817.95.107) K <br />1. Exposed Openings .....................8]6/817.13, ]4, 15, & 823.1 ] & 21 L <br />2. Contemporaneous Reclamation...._ .................. ..........................100 <br />3. Approximate Original Contour ......................... .................102(x)(1) 1 <br />4. Highwall Elimination ........................................ .................102(x)(2) 2. <br />5. Sleep Slopes (includes downslope) ................... .........................107 M, <br />6. Handling of Acid & Toxic Materials ................. .....................102(c) <br />7. Stabilization (rills and eu!lies) ........................... .......................95(6) <br />Signs ..................................................................................... l l (a) ~ (b), &(c) <br />Mazkers ......................................................................1 I (a),(b), (d), (e),&(fl <br />Distance Prohibitions .......................................................(761.11) <br />Revegetanon ..................................................... (816/817.111-116) <br />Vegetative Cover .......................................................................1 ] 1 & 116 <br />Timing ..................................................................................................113 <br />Postmining Land Use ..............................................(816/817.133) <br />2 of <br />H. -Subsidence Control Plan <br />I. Roads <br />1._ Road Consvuction <br />2. Certification <br />3._ Drainage <br />4.-Surfacing and Maintenance <br />5.-Reclamation <br />J. Signs & Markers <br />1. 1 Signs <br />2. 1 Markers <br />K. -Distance Prohibitions <br />L. Revegetation <br />1._ Vegetative Cover <br />2., Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />