Laserfiche WebLink
~atrtb~rt arib ~~gotiate~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />D A I L Y F I E L D R E P O R T <br />PROJECT NUMBER: M96015MT <br />PROJECT NAME: West E.lk Mine <br />PROJECT LOCATION: Somerset <br />CLIENT: West E.lk Mine <br />CONTRACTOR: west Elk Mine <br />DATE: Friday, January 12, 1996 <br />TECHNICIAN: woods <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED: Density tests <br />FOREMAN: Mr. Henry Barbe <br />WORK PERFORMED BY LAHBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 10:15 (A.M.) as requested by Mr. Henry Barbe. <br />I performed soil density tests as requested by Henry Barbe of material being <br />placed in the Gob Pile using nuclear soil density test methods. Please refer <br />to the test results sheets for approximate test .Locations and test results. <br />'lhe test locations were determined by Mr. Henry Barbe. The test results indicate <br />only the relative compaction and soil moisture content of the material tested <br />at the elevation and location tested at the time of our site visit. <br />P. Q WX ~M P. O. lOlf 0016 i14 DODO D0. <br />ORAXD.IUNCTIDK OD ~1l04 1101fT1108E C0 ~1~ OUPJIlIDO.00 fI]01 <br />(~00) !16lEO! (70.1)10313.1 (A7) X0.0006 <br />