Laserfiche WebLink
Below rea®e~4 on the irpWim 1'he oo®o4 oohdo diarmdo6~tia~~idvq~siogtllon CS~~h do drorb~~D' <br />~fa~~~ol ~li~ Iii 8wislb ~m d tlr it v wid~r~ ~ati~ef7ntd rem <br />These was no degrrdabon of wabr geal@y by any fame of the ait+e at the time of the Qapeetion. A oo-ba <br />abmdened amagaay aprllwry from tramrat pmd T-2 wu ah71 plugged (fiat noted during the 1 g Mry 1999 <br />mapection). The abmdonmmt of this emargmcy apr7lway needs b be tecogoded in a revision 14 tho Permit <br />The mine orator disrbatge troatmeot ponds was io good shape and opaatmg properly. Ca®bmed mine avatar <br />discharges from Pond T-2 was measured (bucket and watch) at S galbna in 11 seconds (27.27 gsllons par <br />minute, 0.06 cable feat par saoood). The pH of inflow 1o pmd T-1 was measured as 7.5. The pH of the <br />discharge from Mina 1 was masured as 7.5. The pH of the dischargo from Mina 3 was masurod u 7.0. Mine <br />water level monibprrmg point ware visited and found in bo m good shape. Thee was no noticeable problem with <br />the Mme Number 1 mina water drain syalem. Maintenmca of the long Pond included temporary attiring (until <br />they dram) of cleanings from the long Pend immedietaly upgrade from, and oontignous to, the pond. These <br />cleanings will require permanent disposal The sediment ponds were dry, and was m good shape. Perime6er <br />divermon ditches were m good shape, as were clear water divaaien ditches and rechtmafion area drainages. A <br />very small nickb of water was noted at the aeop botwoeo Mina 3 and Mme 1 on the north side of the road. Thera <br />was a low flow m North Thompson Creek across the Mme 1 site. The Kaiser Sievers ditch was flowing (atavaa <br />the truck dump - rail loadout conveyor cortidor). <br />Backfill and Gradinn Phase I bond release has been approved for tho site. However, some additional backflfl and <br />incidental grading is required over the Mme 1 portals (sections of conraete of both the ooal and au parhla <br />entrance, 6o a depth of 6 inches, are exposed). Settlement away from the portals ores Cyst Hood m tho mapectioa <br />report of Apnl 19, 1999. A pile of subsoil material is available across the creek from the portals. <br />Topsoil Remaromg topsoil is properly stored (near Sed®ent Pond 9) for reclamation ofthe sad®entatian panda. <br />General Mine Plan Comolimce The reclamation has been m compliance with 16e Permit. However, a number <br />of items era under consideration. Sae Rule 1.04036). Permanent retention of dre dirt track across the field Gnm <br />County Road 109 to the Roaring Fork Rives has been requested by the Imdowner. Such retention w171 regnva a <br />technical revision to the Permit. Permanent retention of the road as a trail fb the tan shaft has been requested by <br />the landowner. Sur]r retention will requve s technical revision. Recognition of an approved "slate of repair" to <br />be maintained for the hvo bridges across North Thompson Crock and their retention is required (a technial <br />revision to the Permit). <br />lash and Wildlife There are no current special requvements in the Permit for protee6ou ofFu6 and Wildhf'e <br />resources. A lot of bear scat was observed during the iaspcctioa of the road m the San shalt AD aerie wu noted <br />on the cliff's about Mine 3. <br />Zcvcgclation Disturbed areas of the m ioc were well vegetated. However, a siplifrcaet amount of thistles have <br />~nvndcd the areas of the mine shaft rand and the lower sad®en>ation ponds, with some ecat0ering oftlriados about <br />tilt cutire Nw11r Thompson Crcek mines site areas. Thcsc weeds need to ties cantrolkd (weed mmagemmt). <br />Slides and Damage Coveryge of revegetated areas of Mino Number 3 reclamation dues to debris flow (alluvial <br />:aa~) f ~aal stucp drainages from cli(Ts above the site appear bo be healing well. The erosion future on tho sleep <br />slope between the dum p truck pad and the Kaiser Sievers diuh appears to have arrested. <br />t)a4itC St:nnrirt FIICIIItIC9 Hay bales ~ccrc being stored at the dump truck pad area. <br />:tcclunation Success Reclamation work at the site has been successful. A picture was takes ofthe reclaimed fm <br />shaft norhl and will be an file after the film is developed at the ITivision. The diversity of vogetatien was not <br />Page ~ of ~ Papea, (date) 2 2 ~i 9 9 (initials) <br />