Laserfiche WebLink
AECLAMATIOH COST ~ARY cont'd shee~oF 4 <br />H. EARTHNORK - STREAN CHANNEL RECONSTRUCTION <br />Task No.. Task Description ~ Cost (S) <br />~~ ,' <br />NA <br />Subtotal lH): <br />------------ <br />I. EARTHNORK - DRAIHA6E CONTROL SYSTEM 1NSTALLATIONJRENOYAL <br />Task No.. Task Description Cost IS) <br />, <br />NA ) <br />, <br />, <br />Subtotal (I): <br />------------ <br />J. EARTNMORK - TOPSOILJSUBSOIL REPLACEMENT <br />Task No.. Task Oesrription ~ Cost (S) <br />4 ;Replace 6 regrade 1' topsoil over affected area. 53,377 <br />Assure 7.3 acres E lac.ft.(ac. = l1,177c.Y. <br />Average push distance assueed @ 200'. <br />, <br />Subtotal (J): 53,377 <br />