Laserfiche WebLink
she~of 4 <br />C do Division of Ninerals and Geology <br />RECLAMATION COST SUMNARY FORK <br />----------------------------- <br />---------------------------- <br />PERMIT NUMBER : N-B6-148 PREP. BY: SSS FILENAME: N148-0 <br />DATE : 21-Feb-95 OPERATION: Neaselskin <br />PERMIT ACTION : General 110(21 type permit bond recalculation <br />GRAND TOTAL BOND AROUNT 522,521 <br />I. DIRECT COSTS =_--____-_-_ <br />A. EARTHNORK - BACKFILLIN6 6 ROUGN GRADING <br />Task No.. Task Description ~ Gost (il <br />1 ~ Backfill present lower pit area using CAT 980C ~ 510,596 <br />to haul, spread and compact fill from overburden ; <br />storage area. Assume 200'r200'x15' volume. <br />22,222c.Y. @ ti00' haul distance. <br />, <br />, , <br />, <br />, , <br />, <br />, <br />; <br />, , <br />, <br />, <br />, , <br />, <br />, <br />, <br />, , <br />, <br />, <br />, <br />, <br />, , <br />, <br />, <br />, <br />, <br />, <br />, <br />, <br />Subtotal (A1: S10.59f• <br />8. EARTHNOkK - HIGHNALL REDUCTION <br />Task No.. Task Description '~ Cost IS1 <br />, <br />2 ~ Backfill and regrade highwall to 3:] slope. 52,384 <br />; Assume A00'r avg. 15'high (after task no. I ; <br />backfilling). SOOOc.y. @ 600' haul distance. ; <br />Material is hauled, spread d compacted w~CAT 980C1 <br />, <br />Subtotal 18):---- 52,384- <br />C. EARTHNORK -WASTE PILE C04ER PLACEMENT <br />Task No.. Task Description Cost lS) <br />NA <br />, <br />, , <br />, , <br />Sut~tofal (C): <br />