My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18985
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:09 PM
Creation date
11/18/2007 9:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986148
IBM Index Class Name
Inspection
Doc Date
2/21/1995
Doc Name
WEASELSKIN PN M-86-148 ENCLOSED BOND RECALCULATION
From
DMG
To
WEASELSKIN CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ . .. \ • <br />FLATBED TRUCI COST DATA YORISIR:ET tant'd <br />OPERATOR YAGES <br />Sheet 2 of 2 sheets <br />• <br /> <br />Lahar Classification Zane Designation <br />.Multi-purpose Truck Driver Zone I <br />Zone 2 <br /> <br />Mechanic Ione 1 <br />Zone 2 <br />Rase Rate <br />(13.22 <br />513.72 <br /> <br />(14.71 <br />(15.21 Fringe F.I_C_A <br />Benefits (0.0710) <br />f3.49 fl_02 <br />f3.49 51.06 <br /> <br />f3.49 11.13 <br />13.49 fl_11 Une~pl_ Yk.Carp_ ) <br />(0.062) (0.125) Total) shift Differential (f/hrI <br />f0.82 fl_65 (20.20 ' DaY shift: =0.00 <br />f0.85 f1.12 120.83. ! Swing shift: f0.30 <br />7 Graveyard shift: 10.45 <br />f0.91 11.84 f22.08 ~ 2 shift/daY avg. 10.15 <br />10.94 f1.90 f22.72 ~ ~ 3 shift/daY avg. f0.25 <br />ACQUISITION COST: <br />Rase purchase price (CECG) 132,065.00 <br />Less dealer discount (CEC6 ! 2.221 1705.43 <br />Plus freight (asswe 1.SI) 1400.97 <br />Plus dealer charges (asmne _3f) 196.20 <br />Adiusted purchase price f31,936.74 ~, <br />Plus fates: State sales ! 3I (958.10 <br />5lD1 ! 21 (638.73 <br />less fire cost (CEC6) 11,859.71 i <br />Less salvage value (CEC6 t 15S) 14,790.51 <br />NEi ACQUISITION COST <br />- (26,883.30 <br />~ <br /> <br />COST SUMMARY : - <br /> <br />SINGLE SHIFT DOUBLE SHIFT TRIPLE SKTFD <br /> BASIS BASIS BASIS <br />Zo~re I Zane 2 Zone 1 lone 2 Zone 1 Zaae Q <br />Omership Cost/Nr: 15.13 15.73 13.78 (3.18 (3.13 f3.1~ <br />Operating-Orerhaul Cost/Nr: (7.42 11.46 (1.42 fl_16 f1.42 f7_ <br />Operator Cost/Hr: 120.20 120.83 (20.35 520.98 (20.45 f21_ <br />TOTAL COST/NR : (33.35 134.02 131.55 132.22 131.00 131.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.