My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18903
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:06 PM
Creation date
11/18/2007 9:27:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990025
IBM Index Class Name
Inspection
Doc Date
9/19/2006
Doc Name
Inspection report
From
DRMS whe
To
Four States Aggregates LLC
Inspection Date
7/14/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1990-025 <br />INSPECTION DATE 7/12/06 <br />INSPECTOR'S INITIALS WHE <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />2. <br />3. <br />5. <br />DRMS has estimated the current cost of reclamation at $172,218. The November 20, 2006 <br />reclamation cost estimation represents a $3603 increase over the PB or Pv: PB <br />existing $168,615 financial warranty. ToPIC(Sj: Fw <br />CORRECTIVE ACTION: Pursuant to Rule 4.2.1(2), the permit holder has 60 <br />days, by November 20, 2006, to submit $3603 additional financial <br />warranty to ensure a total bond not less than $172,218, OR complete <br />additional reclamation to ensure that the existing $168,615 is adequate <br />to address reclamation issues. <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />
The URL can be used to link to this page
Your browser does not support the video tag.