Laserfiche WebLink
~~ <br />Richartl D. Lamm <br />Governor <br />• • <br />DEPARTMENT OF NATURAL RESOURCES III ~II~II~II~~II III <br />Davitl H. Getchae. E:ecutlve Director 999 <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />COAL INSPECTION REPORT i <br />Operation: RED CANYON MINE <br />File No.: C-034-81 <br />Operator Name: Grand Mesa Cnal Cmm~anX <br />Permittee Name: Same <br />Address: p_0_ Rnx ~~F <br />County: pglta <br />Inspection Date: .lannary t7, tgA5 <br />Type Of Dperdt l0n: IIn rIR rBrnun Faris ral <br />InspeCtOr: Tnm fillic, Mi4a Inn9 <br />Weather: C.1 as r•, rnnl <br />Time: g~nn A_M_ <br />Type of Inspection: p,,,.t;a1 <br />Operator Contact: Iar~T QCch~e <br />I. General Comments <br />This was a partial inspection of the Red Canyon Mine. Snow cover 4-8 inches <br />deep made detailed observations difficult. <br />Construction work on the sediment pond was still in progress at the time of <br />the inspection. <br />No problems noted. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />