My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18659
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:55 PM
Creation date
11/18/2007 9:26:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Cripple Creek & Victor Gold
Inspection Date
11/6/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ID # OR PROSPECTING ID #: M-iaftn-~aa <br />INSPECTION DATE: >>-n~-~~ INSPECTOR~SINITIALS: aK <br />The Division conducted a water sampling inspection from the under drain discharge for the leach pad <br />facility, on 11-06-02, FOR THE FOURTH QUARTER. Present during the sample collection were Tim Comer <br />and Lawrence Meyers, of CC&V. Both the North and South Under drains were dry. An 8 ounce sample was <br />collected for cyanide analyses, from AG #1 OR COMMONLY KNOWN AS THE 4 "SPRING PIPE, using <br />preserved bottles from CDOH&E. Operator was offered a split, but collected their own sample. Field <br />Parameters were as follows: <br />PH 4.16 <br />TEMPREATURE - 2.7 C <br />CONDUCTIVITY - 1342 <br />DISSOLVED OXYGEN - 9.5 <br />The collected sample was delivered to CDOH&E LAB. <br />While in the area, collected the following readings from the Phase I LOW VOLUME SOLUTION COLLECTION <br />TRANSDUCERS AND PHASE II HIGH AND LOW VOLUME SOLUTION COLLECTION TRANSDUCERS. <br />Phase I low volume solution collection transducer # 1 was recorded at .30 and . # 2 was at .29 <br />Phase II LOW VOLUME SOLUTION COLLECTION TRANSDUCER # 1 WAS AT .54 AND # 2 WAS AT .19 <br />Phase II high volume solution collection transducer # 4 was at 24.3 #S was at 24.3 and # 6 was at 24.3 <br />All readings are in feet of hydrostatic head. <br />Inspected the Phase IV (b) and (c) PSSA and leach pad areas. Due to the cold weather only minor liner <br />repair activity was taking place. Golder QA/QC personnel, Gregory Mcquaid, stated that, until the weather <br />warms up, that is the only activity anticipated in the area. The LVSC are for the phase was holding about <br />the same amount of water noted in during the last inspection, which appeared frozen. <br />I & E Contat Address <br />NAME: PHIL BARNES <br />OPERATOR: CC&V <br />STREET: P O.ROX 19] <br />CITY/STATE/ZIP: VICTOR, CO ftnftfi0 <br />cc: ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.