Laserfiche WebLink
- ~ ~ ~~ . Sheet 1 of 3 <br />Colorado Divleian of Mirarale end Geology <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />Task No. 5 Prep. By: ACS Permit No. M-82-O15 <br />Date 10/02/95 Filename: MO15-5 Operation: Siegrlct Pit <br />Permit Action Monl coring inspection <br />Task Description Neul topsoil from etockpl le to apreadi no alto <br />HOURLY EQUIPMENT COSTS: <br />_____________________= Single, Double or Trlple <br />County: WELD Labor Zone 1 Shifts S <br /> <br /> Equipment Descriptions <br />Truck/load teem - Truck GENERIC tBt, 12.0 to 18.0 cy, on or of f-highwey <br />- Loader CAT 966F <br />Support equip. -Load area: N/A <br />- Oump area: N/A <br />Road mein[. - Grader CAT 14G w ith BOPS cab d ripper/ecarifler <br />- Water T. 2,500 pal . on or off highway <br />Truck/Load Teem Support Equipment Road Melntenance <br />Truck Loader Loed area Dump area Grader Water T. <br />Equipment Filename: 18CYHLTK 966FLODR N/A N/A 14G--3RP 2-SKWTK <br />Utilization on job <br />-Machine: 90X 100X N/A N/A 20X 20X <br />-Ripper N/A N/A N/A N/A 10% N/A <br />Cost Breakdown <br />Ownership cost/hr: f19.92 f26.89 N/A N/A f38.74 f6.88 <br />Operating cost/hr: f19.53 524.25 N/A N/A 56.64 f1.51 <br />Ripper Op. cost/hr: 50.00 f0.00 N/A N/A f0.31 f0.00 <br />Operator cost/hr: (22.03 f22.04 N/A N/A f23.13 (21.41 <br />Unit subtotals f61.4B (73.17 N/A N/A 568.83 (29.81 <br />N of eqp. units 3 1 0 0 1 1 <br />Group subtotals- T/L team : f257.62 Support: 50.00 Rd. Malnt.: 598.64 <br />Total Work Teem Cost/Nr 5356.26 <br />MATERIAL OUANT ITIES: <br />___________________ <br />___________________ <br />Beg. <br />Volume: 71,043 CCY <br />Cu.Yd. ---------- Swell Loose <br />Volume: 71,043 CCY Factor: 1.215 Volume: 86,317 LCY <br />Source of quantity take-off: 7/31/95 inspection report <br />----------------------- <br />Source of est. swell factor: CAT hard took <br />