Laserfiche WebLink
s <br />, <br />R011DABLE EW IPMENT: sheet 2 0} 2 <br />------------------ Total Eqp. Fleet Size Nsul Trip Return Trlp <br />Machine Descri pt ion Cost/hr (ra. hauled) Coat/hr Coet/hr <br />eaazczccccaacacccacc:e:c:ca:_ c::::vccvezzzzzzczzzzzzz-zzzzzzazzzzzazazazzzzcaavaaa=aczceacevvaaeacaavv <br />18t on/off hwy haul truck f61.48 3 f184.44 (184.44 <br />2500 pal. water wagon f29.81 1 (29.81 f29.81 <br />Stbtotele (214.25 (216.25 <br />MOB/DEMOB SUPPORT EOUI PMENT: --------- ------- <br />--------------------------- Yei ght Ownership Heul Rip Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roedable Eqp. Description (tone) Cost/hr Cost/hr (rp. hauled) Lost/hr Foet/hr Coat/ea <br />.:__ cooaa.a=aaaa_ ________________________ _________________ <br />____________________________________________________aa_________-________a______________________ <br />Slbtotale : f0.00 f0.00 f0.00 <br />Tatel Eqp. Fleet Sixa Naul trip Return Trip <br />Roadeble Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />zecc=c:::::::_______________________________________________acccvaacacvccc____ <br />asaccaaacc c: aace:c:_ accvvccaac. e:aaacvcaacccaaeccaavavvaeevvazaaeavazzzzzaazzazzaczzzcaavvazavazvav <br />Subtotals (0.00 (0.00 <br />EDUIPMENT NAl1L DISTANCE 8 TIME <br />Nearest major city or town within project area region: Denver <br />Total one way travel distance = 25.0 <br />------ miles. Average travel speed = <br />--- 45.00 <br />---------- mph <br />Job Time - Non Roadeble Equip.= 1.00 hours load Roedable Equip.= N/A hours load <br />0.56 hours haul 0.56 hours haul <br />1.00 hours unload N/A hours unload <br />0.56 hours return 0.56 hours return <br />J08 COST <br />Total Mob/Demob Cost = (2,661.21 <br />avaaavvvapaav <br />NOTE: Non-roadable equipment (haul rip required to transport) nob/demob costs based on 2 round tripe, each trip <br />consisting of a one-way loaded haul end a one-way e~ty return. Readable equi Anent (no haul rip required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits ere required for each ris on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending art degree of oversize) ere also required far oversize <br />equi Anent hauling, and loading/unloading times mist be increased substantially for equipment which meet be <br />partially dismantled for transport and re-assembled at the job site. Costa for lifting equipment end other <br />support equipment needed for this work should be included in the mob/demob costs. <br />