Laserfiche WebLink
.. ~ ~~ <br />Truck Cyels Tlme gheet 3 of 3 <br />Exchange N = 0.70 min. Adj. for altituds = 0.70 min. <br />' Load 1.650 min. " " " 1.65 min. <br />Maneuver 8 du~Q = ^__1.20 min. ° " " • __1.20 ml n. <br />Travel Time (haul L return): <br />Road cond. descr.:Firm, smooth, rolling dirt/lt. surfaeed road, malntelned <br />Raul route <br />Road Length Grade Roll inp Total Velocity Travel time <br />seg. Y (ft) res.(X) rea.(X) res.(X) (fpn> (min) <br />1 3,500 0.00 3.00 3.00 2994 1.52 <br />Xaul time • 1.52 min. <br />Return route ------ <br />1 3,500 0.00 3.00 3.00 3360 1.29 <br />•tst 8 last sap. adJ. for accel./decal. Return time = 1.29 m1 n. <br /> Total Truck cycle Time 6.35 min. <br />Loader Unit Prod.= 425.11 LCY/Hr Adj. for efficiency= 352.84 LCY/Hr <br />Truck Unit Prod.= 157.26 LCY/Hr - AdJ, for efficiency= 130.53 LCY/Xr <br /> Optimal number of trucks per loading unit 3 <br /> Selected nudxr of trucks per loadl n9 unit N 3 <br /> Hourly truck team production 391.58 LCY/Hr <br /> Net Hourly Truck/Loader Team Production : 352.84 LCY/Hr <br /> Net Hourly Multiple T/L Team Production : 352.84 LCY/Nr <br />JOB COST: <br />Fleet Size 1 T/L Teem(s) Total Job Time: 244.64 Hours <br />unit cost 21.010 /LCY iotel Job Coat: f87, 154 <br />