Laserfiche WebLink
<br /> <br /> <br />II. Compliance wi t~ Colorado Sur'ace Coal :li n±^g Reclamation .ict <br />CRS 1973, as amended 34-3J-ZO_', _t. seo., <br />and the <br />Rules and _9eau_'at:ons Issued Pursuant to t5e .7ct <br />This includes a list;:q of the aart;cular provisions of the requiatory grogram which were <br />examined during the course of tYi.s inspection, and iden t fies enforcement actions taken <br />during t5e inspection for failure to comply with the Rules and Requla~ons, the .ict and <br />the permit. <br />9.01 General Provisions <br />A11 requested documents were available for inspection. <br />4.02 Signs and Markers <br />Perimeter markers and the topsoil marker were in place. The mine I.D. sign will <br />have to be changed to reflect the new permit number upon issuance of the permanent <br />program permit. <br />4.03 Roads <br />The access road and associated ditches and culvert were all in good shape. <br />9.05 Hydrologic Balance <br />The sediment control system appeared to function properly during recent rains, <br />since there was no evidence of off-site effects. <br />4.20 Subsidence,COntrol <br />The areas overlying the OCN2 and OCNl workings were walked over. No subsidence <br />problems from the OCN2 workings are evident on the ground. However, numerous depressions <br />believed to be due subsidence of the OCN1 workings were evident. <br />