My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18159
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:33 PM
Creation date
11/18/2007 9:24:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X199920506
IBM Index Class Name
Inspection
Doc Date
11/26/2003
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
6/26/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ TWENTYMILE COAL CO. Permit C-036-81/056-82 Field Visit 06/26/2003 Continuation Page <br />Person Number Date <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=No[ Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees --Failure [o Pay <br />B. Hyd rologic Balance <br />l._ Drainage Control <br />2. _ Inspections & Certifications <br />3._ Siltation Structures <br />4._ Discharge Structures <br />5._ Diversions <br />6. _ Effluent Limits <br />7._ Ground Water Monitoring <br />8. Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11. _ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1._ Removal <br />2__ Substitute Materials <br />3._ Storage and Protection <br />D. Backfilling & Grading H. <br />Subsidence Control Plan <br />1. _ Exposed Openings _ <br />I. Roads <br />2 ._ Contemporaneous Reclamation Road Construction <br />1. <br />3. ~ Approximate Original Contour _ <br />2. Certification <br />4. _ Highwall Elimination 3._ Drainage <br />_ 5. _ Steep Slopes (includes downslope) 4._ Surfacing and Maintenance <br />6. _ HandUng of Acid & Toxic Materials 5. Reclamation <br />7. _ Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal 1._ Signs <br />1. _ Placement 2, <br />Markers <br />2. Drainage Control _ <br />K, Distance Prohibitions <br />3. _ Surface Stabilization <br />L, Revegetation <br />4. _ Inspections & Certifications 1. <br />Vegetative Cover <br />F. C oal Mine Waste _ <br />2. <br />Timing <br />1. (Refuse Piles/Impoundments) <br />_ Drainage Connol _ <br />M. _Postmining Land Use <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. Inspections and Certifications Performance <br />5. _ Impounding Structures Catagory <br />G. U se Of Explosives D 1 1) ar;_ltea holes <br />1. _ Blaster Certification <br />2. _ Distance Prohibitions 2) <br />3. BiastSurvey/Schedule , <br />4. _ Warnings & Records 3) <br />5. _ Control of Adverse Effects _ <br />A. <br />B. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br /> Adminfstrative ................................. ........................................ <br />1. Valid Permit .............._..............._......... _...... ..................._.............773.11 <br />2 . Mining within Bonded Area ................. ...............................773.1 I <br />3 . Terms & Conditions of Permit .............. ...............................773.17 <br />4 . Liability Insurance ................................. ...............................800.60 <br />5 . Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11(e) & 876/817.[31 <br />7. AML Rec. Fees -- Non-RespondanL ...... .........................870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br /> Hydrologic Balance .......................... ............(816/817.41.57) <br />1. Drainage Control ............................................ .............................45 <br />2. Inspections Rc Certifications ........................... ........._.......49(a)(10) <br />3. Siltation Structures ......................................... .............................46 <br />4. Dischage Stmctures .........................._......._ ..............................47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Limits ............................................... ................_...........42 <br />7. Ground Water Monitoring ......................_...... . _.._....._..._._..41(c) <br />8. Surface Water Monitoring .............................. ........................41(e) <br />9. Drainage--Acid -Toxic Materials ................... ........................4](f) <br />10. Impoundments ................................................ ............................49 <br />11. Stream Buffer Zones ...................................... .............................57 <br />C. Topsoil & Snbsoil ...............................................(816/817.22) <br />1 . Removal ................................................... ...............................22(a) <br />2. Substitute Materials .................................. ..............._............22(c) <br />3. Storage and Protection ............................. ................................22(c) <br />4. Redistributioa .................._...................... ......._......................22(d) <br />D- Backfilling & Gtading ..................... .........(816/817.95-107) <br />1. Exposed Openings .....................816/817.1 3, 14, 15. & 823.11 & 21 <br />2. Contemporaneous Reclamation........__._. _._..........._..._......._.,100 <br />3. Approximate Original Con[our .................. ........................102(a)(t) <br />4. Highwall Elinuna[ion ................................. ..................._.,.102(a)(2) <br />S. Steep Slopes (includes downslope) ............ ................................107 <br />6. Hardline of Acid & Toxic Materials ......... .............................102(c) <br />7. Stabilization (rills and gullies) ................... ...............................95(b) <br />E. Excess Spoil Disposal ........................................._(816/817.71-74) <br />1. Placement ...........................................................................................71(e) <br />2. Drainage Control .............._......................................................_........71(fl <br />3. Surface Stabilization ...........................................................................71(gl <br />4. Inspections &Certifications ..........................._..............._.................71 (h) <br />F. Coal Mine Waste (Refuse Ptles/Impoundments) ,,,,,(816/817.81-84) <br />1. Drainage Control .................................... ...................................._.....83(a) '. <br />2. Surface Stabilization ................................ ......._......................_.........83(b) <br />3. Placemen[ ................................................. ..........................................83(c) <br />4. Inspections and Certifications .................. .........................................83(d) <br />5. Impounding Structures ......................_..... ....................._.......................84 <br />G. Use of Explosives .............................. ....................(816/817.61-68) <br />1. Blaster Certification ................................. ..............._.........................6](c) <br />2. Distance Prohibitions ............................... ......................................._.61(d) <br />3. Blast Survey/Schedu]e_......_ ................_.. ................................_.......62-64 <br />4. Warnings & Records ................................ ......................................66 & 68 <br />5. Control of Adverse Effects......_ ............... .........._........_........................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />I. Roads .................................................................(8161817.150.151) <br />1. Road Construction ...........................................................................150(c) <br />2. Certification ......................................................................................151(a) <br />3. Drainage ...............................................................................150(b)-151(d) <br />4. Surfacing and Maintenance.._........._ .............._................ _.150(e)-151(d) <br />5. Reclamation...._ ...................................._......._.........................,.......150(f) <br />Signs & Markers .......................................................(816/817.11) <br />1. Signs .....................................................................................11{a),(b).&(c) <br />2. Mazkers........._ ................_.._..._..__..........................11(a),(b),(d),(e),&(f) <br />K. Distance Prohibitions .......................................................(761.11) <br />L. Revegetation .....................................................(816/817.111-116) <br />1. Vegetative Cover .......................................................................111 & 116 <br />2. Timing._....._ ........................_.........................._..................................113 <br />M. Postmining Land Use ..............................................(816/817.133) <br />Page 2 of _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.