My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18148
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:33 PM
Creation date
11/18/2007 9:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979221
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/28/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 9 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description Cos[ ($) <br />Subtotal (K1: <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Cost (51 <br />__________________________________________________________I__________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />6 <br />Demolition <br />Seeding <br />Fencing <br />Mob/Demob <br />Subtotal IM): <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M1: <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 6 PROFIT <br />Cost ($) <br />58,500 <br />51,8]5 <br />$10,3]5 <br />$31,009 <br />Item No.~ Item Description ~ Cost (51 <br />1. ~ Public Lnabil rCy Insurance.... 1. SSOk of dit. ~ 5981 <br />2. ~ Contractor's Performance Bond 1.550E of dir. ~ 5981 <br />3. ~ Contrac [o is Profit........... 10. OOk of dir. ~ 53,101 <br />4. ~ Job Superintendent.. <br />________________________________________________________________________ <br />Subtotal (AI: $9,062 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (d irec[ plus 0 b P1: 535,0]1 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (51 <br />1. ~ Minerals Program Admin. Fee at S.OOk of cntr.~ 51,]59 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 1B.]6k Suh[o[al IB1: $1,]59 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B1: $5,816 <br />TOTAL PERFORMANCE BOND AMOUNT Idireo[ plus indirect costs): $36,825 <br />
The URL can be used to link to this page
Your browser does not support the video tag.