Laserfiche WebLink
<br /> <br /> <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. M-71-345 <br />DATE: September 12, 1985 <br />OBSERVATIONS OF IMPORTANCE: <br /> <br />1. The area is under temporary cessation, however, some material w.is <br />removed sometime during this annual period. Amount of material removed <br />was from stockpiles on the order of 100 tons. <br />2. This removal would remove this site from temporary cessation st;itus. <br />Please submit, at the anniversary date, the annual report and associated <br />annual fee. <br />3. If operation does again cease for more than 180 days, a request for <br />temporary cessation should then be again made. <br />4. Area was extensively mined pre-law. Site is just west of limesi;one <br />quarry on side of hill. No topsoil was salvaged. <br />5. Total disturbance around 3 - 4 acres. Material is blasted at site then <br />trucked to plant site for crushing. <br />6. Slides 35-36: Overview of Quarry (Inside Area) <br />37: Quarry Area from Boettcher Limestone Quarry Site <br />7. Financial Warranty of $5,000.00 is adequate for this site. <br />PVOC/mis <br />3380E <br /> <br />