Laserfiche WebLink
r, <br /> <br />~.a~rtb~rt a~tb ~$~otia~g <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />D A I L Y F I E L D R E P O R T <br />PROJECT NUMBER: M95o3oMT DATE: Friday 7-21-95 <br />PROJECT NAME: west Elk Mine -Lone Pine waste TECHNICIAN: Hayes <br />Pile <br />PROJECT LOCATION: Somerset, Colorado WEATHER CONDITIONS: Clear <br />CLIENT: Mountain Coal Company WORK REQUESTED :Density tests <br />CON7RAC70R: Harrison Construction FOREMAN: Mr. Rick Johnson <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND R'cMARKS) <br />I arrived at the project site at 10:00 A.M. as requested by Mr. Rick Johnson. <br />2 performed soil moisture content and soil density tests as requested by <br />Mr. Johnson of material being placed for fill at the Lone Pine Waste Pile, using <br />nuclear soil density test methods. Please refer to the test results sheet for <br />approximate test locations and test results. The test results were verbally given <br />to Mr. Johnson of West Elk Mine at the time of our site visit. The test results <br />indicate only the relative compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time of our site visit. <br />i~ . <br />~W~p~i~`~ `~~7 <br />=5f EL~< ~~i~IN'- <br />glneerlns ,- : ~ <br />r. a eoc awe <br />owwe~croN.coneox <br />poal a~seeae <br />~. a enx oae <br />roKr~osEto n~ox <br />c~ a~e•re~ <br />au eooo oti <br />oun~HOO.oo naoi <br />pool aee.aoea <br />