Laserfiche WebLink
Ill Illlllllllllllll <br />999 <br />Mountain Coal Company <br />wed EAc Mine <br />Pad OItice Box 591 <br />Sarne~sat, Cabrstlo 81434 <br />rebp,one 3oae2tiso,e <br />Fsx 303 9295,595 <br />October 5, 1995 <br />Ms. Christine Johnston <br />Colorado Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RFrEIVED <br />OCT l 3 1995 <br />Division of Mmerais a Ueuro9Y <br />Re: 3rd Quarter 1995, Pond,Stockpile and Mine Site Inspection Reports, <br />Mountain Coal Company, West Elk Mine, Permit No. C-80.007 <br />Dear Christine: <br /> <br />la compliance with the Regulations of the Colorado Mined Land Reclamation Board for Coal <br />Mining and Reclamation, at 4.10.2 and 4.05.6 (1 I) (C), attached are the referenced quarterly <br />pond, stockpile, and mine site inspection reports. Also enclosed are the survey data for the Lower <br />Refuse Pile and certifications. Compaction testing was performed on the Lower Refuse Pile <br />because a new lift was completed during the third quarter of 1995. <br />Several lifts were completed on the Lone Pine Gulch Development Waste Pile during the third <br />quarter 1995, and the results of the density and compaction testing are attached. The subsoil and <br />topsoil was also redistributed on the pile and copies of the pictures are attached for your records. <br />The Colorado Division of Water Resources, Office of the State Engineer, inspected the dam <br />embankment of Freshwater Pond No. FW-1 on September 15, 1995, for their annual inspection. <br />If you have questions, contact me at (303) 929-2238. <br />S' <br />6 <br />envy A. B e <br />Environmen al Coordinator <br />Enclosures <br />xc: C. M. Nyikos <br />K. G. Welt <br />File COMP-1059 <br />