My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18074
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:30 PM
Creation date
11/18/2007 9:23:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
10/13/1995
Doc Name
3RD QUARTER 1995 POND STOCKPILE & MINE SITE INSPECTION REPORTS MOUNTAIN COAL CO WEST ELK MINE PN C-8
From
MOUNTAIN COAL CO
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ill Illlllllllllllll <br />999 <br />Mountain Coal Company <br />wed EAc Mine <br />Pad OItice Box 591 <br />Sarne~sat, Cabrstlo 81434 <br />rebp,one 3oae2tiso,e <br />Fsx 303 9295,595 <br />October 5, 1995 <br />Ms. Christine Johnston <br />Colorado Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RFrEIVED <br />OCT l 3 1995 <br />Division of Mmerais a Ueuro9Y <br />Re: 3rd Quarter 1995, Pond,Stockpile and Mine Site Inspection Reports, <br />Mountain Coal Company, West Elk Mine, Permit No. C-80.007 <br />Dear Christine: <br /> <br />la compliance with the Regulations of the Colorado Mined Land Reclamation Board for Coal <br />Mining and Reclamation, at 4.10.2 and 4.05.6 (1 I) (C), attached are the referenced quarterly <br />pond, stockpile, and mine site inspection reports. Also enclosed are the survey data for the Lower <br />Refuse Pile and certifications. Compaction testing was performed on the Lower Refuse Pile <br />because a new lift was completed during the third quarter of 1995. <br />Several lifts were completed on the Lone Pine Gulch Development Waste Pile during the third <br />quarter 1995, and the results of the density and compaction testing are attached. The subsoil and <br />topsoil was also redistributed on the pile and copies of the pictures are attached for your records. <br />The Colorado Division of Water Resources, Office of the State Engineer, inspected the dam <br />embankment of Freshwater Pond No. FW-1 on September 15, 1995, for their annual inspection. <br />If you have questions, contact me at (303) 929-2238. <br />S' <br />6 <br />envy A. B e <br />Environmen al Coordinator <br />Enclosures <br />xc: C. M. Nyikos <br />K. G. Welt <br />File COMP-1059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.