Laserfiche WebLink
Page -2- <br />Backfilling and Grading - Rule 6.1 <br />Addits and shafts <br />Final graded slopes-icighwall elimination terraces <br />Overburden thickness <br />Spoil handling procedures <br />Erosion-rills or gullies/erosion control <br />Toxic, acid forming or combustile material handling procedures <br />Grading along contour <br />Slope <br />Stability , <br />Affect on lands outside permit area <br />Handling of drill or auger holes <br />Comments: <br />No final graded elopes. Aighwall elimination tnrracea have not been <br />completed at this time. bverburdan hoe been stockpiled above the quarry <br />site. No erosion problems noticed. No final grading or backfilling at <br />this time. No apparrent effect on lands outside of the permit area. <br />Vertical pit highwall 60' to 80'. <br />Protection of Hydrologic Svscem Rule 6.2 <br />Dams <br />tdater leaving affected area <br />Surface caster monitoring <br />Diversions temporary/permanent <br />Stream channel diversions <br />Sediment Control/Ptaintenance of Ponds <br />Discharge structures <br />Acid or to:<ic materials <br />Ground caster monitoring <br />Permanent impounds <br />Haul ~ access road drainage <br />grade <br />Drainage Ditches <br />Culverts erosion control <br />Other transport facilities <br />Other agencies or permits <br />Presence of leachate <br />Comments: <br />No problem with hydrology on the site. <br />[1 i t ri l i f er <br />Rule 6.3 <br />Safety S Protection <br />Critical species observed <br />i:ey species to iJhich habitat restoration is aimed <br />Comments: <br />Rey species to which habitat restoration is aimed would be mule deer. <br />