Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />~~~~FICE OF SURFACE MINING <br />~~ 006 Mine Site Evaluation <br />Noati ,~pl State Program <br />1.Permittee/Person ,q~era"a 9. Permit Number 10. Permit Type <br /> TERROR CREEK CCb.l~~?°~ C-059-83 PP <br /> 2. Address 11 . Field Visit Date 12. Purpose 13. SRA Present <br /> 1840 HIGHWAY 133 12/07/2005 <br />3. City 4. State mm-dd -yyyy <br /> <br />CO 14. Permit Status I5. Site Status 16. Facility T e <br />PAONIA ADFG <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81428 (970) 929-5855 <br />40 <br />7. Operatpr Name, if Different than Peanittee 1 <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> DELTA <br />i <br />N 05-03818 CO <br />ne <br />ame <br />8. M <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />TERROR CREEK LOADOUT <br /> 097719 <br />25. Honrs 26. gnatm•e Block 27. Reviewing OfficiaL• <br /> <br />1.0 a. Permit Review p ~ <br />~ 1 /~~ ~~,, <br /> it <br /> Sig e: IZ[Z/3f pj <br />I Signature: <br /> 2 <br />0 b. Site Visit Time <br /> , HENRY A TIN H) # l16 <br />Travel Time <br />c Review Date: (~/Z~/ YAtD~ <br />. <br />8.0 Printed Name: mm - dd - yyyy <br />1,0 d. Report Writing Date: 12/20/2005 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item'12 CCR....Citizen Complaint Referral (non site visit) <br />p~....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.._ Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left thestte without completing reclamation as tlefned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.'I1(g) <br />permitted but not yet disturbed. A81.. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactrve (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations, (Interim Program Permit) A82..Partially Reclaimed Forteiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Fofeiture: Forfeited site that has been reclaimetl to Program standards. <br />Authority (RA) has released all of the bond (Phase II I Release.) NA....Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />N D...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forteiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phose bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted pertormance bond(s), and/or reclama- <br />have started and where wal mining operations cessation of-mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 8'17.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />P1 <br />Ph <br />I R <br />l <br />At l <br />t Ph <br />I b <br />d <br />l <br />ti <br />l <br />t <br />C <br />l <br />f <br />i <br />l <br />d <br />i <br />... <br />ase <br />e <br />ease: <br />eas <br />on <br />re <br />ease rec <br />ama <br />on comp <br />e <br />oa <br />sur <br />ace min <br />ng <br />ase <br />e <br />. <br />AP.. Active Coal Produc <br />ng: <br />activities are occurring, granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN„ Active Nan-Producing: Active non-producing permits, partial bond release. is Permitted but there is no bond. <br />facility such as tipple or Preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item'16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H.,.Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse andlor Impoundment I.., Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J.., Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Resionai Fairness Boards were established to receive comments fro <br />small businesses about Federal agency enforcement actions. The Ombudsman wHl annually evaluate the enforcement activities and rate each aeenc 's <br />responsiveness to small business. If you aze a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />_ <br />and wish to comment on the enforcement or compliance acfivities of OSM, call I-888-REG-FAIR (1-888-734-3247). xr;,<an«~n~ra, i99s <br />