Laserfiche WebLink
CIRCES Cost EsSmatlnD Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />T _-__.______ __ .._._..____ ._______ _ __ ____ __ <br />PROJECT I DENTIFICATION <br /> Agana or organization name : DMG <br />Teak#: O6a State:COloredo Penniuob#:M-1987.074 <br />Date: 10242002 Caunty:Eagle Abbreviation :none <br />User: SSS Site :lbfsem Quarry Filanama:M074-06a <br />Permit w otherjob action : Routine bond recalculation <br /> Task deadilxion :Haul topsoil /rom stockpile fo varlos locations across disturbed area <br />r__- <br />~ _..___-________.__._ __._ __ ___ __ __. _ _ . _._ , <br />__ <br />HOURLY E _ <br />QUIPMENT COST Basic machine: CAT 966F S.2 ittl. aR (1999) Horsepower: <br />220 <br /> AflarhmeM no.1:ROPS Cab Shifl basis: lper day <br /> Cost Breaktlown : Oanarship wsOlwur $30.78 Cost data source : (CRG) <br /> Operating mstRwur: $30.]4 100%job utilization <br /> Operator mstmour: $17.89 <br /> Total unit cosMOUr: $89.51 Total Keel cosvhour- 589.51 <br />t <br />Initial Swell Final <br />volume: 6,050 LCY factor- NA volume: 8,050 LCV <br />Source M quaMiry take-oR: Assume 3 inches o/materiel spread over 15 ecredistuAed area <br />Source M estimated swell trwtor : NA <br />(Cat HB) <br />Loader Cvde Time Uratljustatl basic ryde time (IOaQ tlump, maneuver) : 0525 minutes <br />Cycle Time Fedora Factor (min.) Bourse <br />Material : Mired material 0020 (Cat HB) <br />Slackpile: Conveyorwdozw piled fO R. hgh arM Up 0.000 (Cat HB) <br />Truck ownership: oadjusfinent-lector not appliwbk 0.000 (Cat HB) <br />Operation: oadjusfinent-lector not appl¢able 0000 (Cat HB) <br />Dump target : ominel teryet 0000 (Cat HB) <br />Net cycle time adjustment: 0.020 minutes <br />Adjustetl basic cycle Bme : 0.545 minutes <br />Ratlines Resistance - Roed Conditions <br />Haul :Soft, nMed did, no maintenance w wafer, d' fire penefrefion <br />Retum :Soft, raked did, rro maintenance or wafer, 4'fire penetrefion <br />Haul and Retum Time Length Grade rea. Rolling rea. Total rea Trevel time Data <br />(teat) (%) (%) (%) (minutes) Sauna <br />Haul route : 400 0.00 8.00 8.00 0.969 (Cat Hl <br />Retum route: 900 0.00 8.00 6.00 0.393 lCat H! <br /> Total travel lima: 0677 minmes <br />Load er Bucket CaoeciN Total ryde time : 1.422 minutes <br /> Rated capadh: 9.50 LCV lheaped) <br /> BurJCet till fades: 1.050 Other-mast bam (100-110%) <br /> <br /> Adjusted rapedry: 4J3 LCY <br />Job C ondition Comeclion Fedora Source <br /> Bite eltitutle: 7,200 feet AlBtrde adjustment fades: 1.00 (Cat HB) <br /> Jab eRctenry fades: 0.83 (1 shiR/day) <br /> <br /> Net conedion: 063 multiplier <br /> Unedjustetl hourly unit production: 19937 LCV/Hr <br /> Adjusted hoary unit production : 165 47 LCVMr (Cat HB) <br /> Adjusted rlouky Beet production: 165.47 LCVMr <br />C_ _- ------- -____ _~._-_-_ _ _ ___ _ _. <br />JOB TIME AND COST <br /> Fleet size: 1 Loatlerys) Total pbtime: 38.55 Hours <br /> Unit coat: $0.501 /LCV Total job coal: §3,173 <br />~.. ___. .__ .._ __ __.___. -._._ _ -__- _-______ ,__.. _ _. __J <br />