Laserfiche WebLink
<br />RECLAMATION COST SUlIIAARY cont'd <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />________ ____________ <br />__________________________ <br />I. EARTHWORK <br />Ta 9k No.~ <br />Subtotal lI): <br />J. EARTHWORK - TOPSOIL/SI185OIL REPLACEMENT <br />Task No.~ Task Description ~ Cost ($) <br />8 ~ Naul 11,074 cu.yd. topsoil; scraper ® $O.SOlcu.yd~ $5,537 <br />9 ~ Respread 11,074 cu.yd. topsoil ~ $2.329 <br />________________________________________________________________________ <br /> <br />sheet 3 of 4 <br />~ Cost (S) <br />____________________ <br />Subtotal IH): <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description ~ Cos[ ($) <br />________________________________________ <br />_____________________________________________________ <br />Subtotal IJ): $7,866 <br />