My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17776
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:17 PM
Creation date
11/18/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
Inspection
Doc Name
DMG MINERALS PROGRAM INSPECTION REPORT
Inspection Date
7/1/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ • Colorado Division of Minerals and Geol• <br />_________________________________________ <br />ESTIMATING FORM - BULLD02ER WORK <br />Task k: 9 Prep. by: TAS Task File Name: M079-9 <br />____________ _________ _____________ <br />Date: 07 j13/9H Permit p:M-H6-079 Mine: M 6 G P1t <br />Permit Action: Final Reclama Ci on <br />Task Description: Respread 11,0]9 cu.yd. topsoil <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DBN <br />Blade Type: UNI VEASAL <br />Attachment pl: ROPS Cab <br />Attachment #2: N/A <br />Horsepower: <br />Shift Basis: 1/day <br />2H5 <br />Cost Breakdown: <br />"~~-""'~-" Utilization t <br />Ownership cost/hr = $3]. 34 N/A <br />Operating 6 overhaul cost/hr- dozer = 555. 71 100 <br />-ripper = 50. 00 N/A <br />Operator cost/hr = $23. 12 N/A <br />Total egpt, unit cost/hr = $115. <br />______ ]6 <br />__ 'Coral fleet cost/hr: 5115."16 <br />________ <br />MATERIAL UDANTITIEB <br />Initial Swell Loose <br />Volume: 11,074.0 LCY Factor: NjA Volume: 11,0]9.0 LCY <br />____________ __________ _____________ <br />Source of qua nti[y take-off: permit <br />____________________________________________________ <br />Source of est. swell factor: program <br />____________________________________________________ <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 150 tt. --""'--""'--"-"--"-"---- <br /> Operator.......... 0. ]5 avg. <br />Unad7 usted hourly Mat. consistency.. 1. 20 (Cat [bll <br />dozer prodvcti on: 716 LCY Jhr Dozing method..... 1. 00 (gen.) <br />' -"-" "- Visibility........ 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 83 (lsh/day) <br />Loose stockpile Spoil pile factor. 0. ]0 (fnd-mf) <br />_____________________ ________ ________ Push gradient..... 1. 02 (Cat [bl) <br />Avg. push gradient: 1.00 k (neg) Altitude deration. L DO (Cat tbll <br /> ""--"" Material weight... 1. 99 ICaC tbl) <br />Avg. site altitude: <br />_ 6000 <br />________ ft. Blade type........ <br />_____________________ 1. <br />_________ 00 <br />__ IS or U) <br />Material weigh[ 1600.00 16/LCY Ne[ Job Correction 0. 77 <br />Mat. Descr.: _ ________ ____..____ __ <br />Top Soil Adjusted Unit Prod.: 550. 50 LCY/hr <br /> Adjusted Flee[ Production: 550. 50 LCYfhr <br />JOB COST "--""" '- <br />Fleet size <br />_ 1 <br />_______ Dozers) Total Job Time: 20. <br />_________ 12 <br />__ Hours <br />Dnit Cost <br />_ $0.210 <br />_______ /LCY Total Job Cosc: $2,328. <br />_________ ]1 <br />__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.