Laserfiche WebLink
<br /> <br />It was agreed to leave the sampling sites for the lower drainages at <br />their present location and to grab opportunl5tic samples on Dry Gulch and <br />lipan Wash at their confluence with the Big Salt Wash if flow 1s present. <br />The continuous monitoring flume on the Big Salt Wash downstream of Garvey <br />Gulch was Inspected. The flume is properly implaced with concrete <br />wingwalls. A crest stage gauge is present to measure the high flow <br />events but has been overtopped on previous occasions. Th15 gauge should <br />be heightened in order to record maximum flows. This is particularly <br />important as the applicant will have surface facilities located along <br />th15 section of the 81g Salt Wash and may plan to relocate the channel. <br />