Laserfiche WebLink
i , <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the New Pryor Mine for the month of Janurary, 1998. <br />HYDROLOGIC BALANCE: The site is partially covered with snow. There are no signs of <br />snowmelt causing any erosion problems and it is unlikely anything will occur before spring. Ic e <br />is visible in pond Z and the upper and lower ponds. No signs of any discharge was visible from <br />the air. <br />