Laserfiche WebLink
<br /> <br />MINE ID k OR PROSPECTING ID rY M-1!83-158 <br />INSPECTION DATE 10/17/00 <br />(Page 31 <br />INSPECTOR'S INITIALS WHE <br />The following problems IPB) and/or pos:sible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />DMG has reviewed the cost of reclamation for the full 9.0 acres of <br />affected land and has determined that the existing $4,000 financial <br />warranty is insufficient to ensure reclamation. DMG current <br />reclamation cost estimation totals 516,407. Pursuant to Rule <br />4.2.112), the operator has 60 days from the signature date of this <br />notice to provide 512,407 additional financial warranty, to ensure a <br />total financial warranty not less than 516,407, OR the operator may <br />elect to complete sufficient reclamation to ensure the adequacy of <br />the financial warranty. <br />CORRECTIVE ACTION: Within 60 days, by December 26, 2000, <br />ensure that DMG has received an appropriately executed financial <br />warranty totaling not less than 516,407, OR by December 26, <br />2000, complete sufficient: reclamation of the affected lands to <br />ensure the adequacy of the existing financial warranty. <br /> <br />12/26/00 <br />PB or PV: PB <br />TOPICISI: FW <br />Attachment: DMG 10/26/00 reclamation cost estimation; and <br />Certificate of Service <br />