My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17534
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:09 PM
Creation date
11/18/2007 9:21:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Inspection
Doc Name
MINERAL PROGRAM INSPECTION REPORT
Inspection Date
6/4/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ ' ~ (Page 3) <br />MINE ID # OR PROSPECTING ID # M-77-141 <br />INSPECTION DATE 06/04/99 <br />INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />DATE <br />1. The Lyons Quarry is currently underbonded. The financial warranty _ <br />will need to be revised from its current amount of $142,800.00 to PB or PV:PB <br />$191,600.00. TOPIC(S):FN <br />CORRECTIVE ACTION: - <br />The operator will need to submit an additional $57,100.00 to be in <br />compliance with the Act and Rules and Regulations. The operator <br />will need to submit the $48,800.00 additional bond by June 24, 1999 <br />in order to avoid a possible violation of insufficient bond and <br />appearance before the Mined Land Reclamation Board at the July 27- <br />28, 1999 Board Hearing. <br />2. As required by Rule 3,1.12(2), permit boundary markers need to PB or PV:PB <br />be installed around the affected area of mining. TOPIC(S):BM <br />CORRECTIVE ACTION: <br />Submit to the Division proof of posting of the permit boundary <br />markers by July 30, 1999. <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.