Laserfiche WebLink
<br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Sunlight Mine conducted by Erica Crosby of DMG. The mine <br />is a bond forfeiture site, therefore, no company representative was present during the inspection. <br />The inspection involved viewing tow aerial photographs taken by Harry Ranney of DMG on <br />March 26, 1998. Snow cover was present on site, at an estimated depth of 1' to 2'. <br />Roads The light use road leading to the upper portal, and lower fan area were under snow cover. <br />Hydrologic Balance The pond was under snow cover and appeared dry. The upper diversion <br />ditch was also under snow cover, and appeared functional. <br />Backfilling & Grading The backfilled mine area and portals were under snow. No major slides <br />or stability features were noted. <br />