My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17172
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:57 PM
Creation date
11/18/2007 9:19:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
7/25/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and [he termination of violations cited during previous inspections. <br />Violation CV-2005-005 was issued on May 13, 2005, in two parts. Required abatements of the two parts, <br />including an option in Part 2, are described (abbreviated) with required abatement dates indicated as follows: <br />Part Descri lion Abatement Date <br /> <br />1 Remove topsoil a setback distance from the sediment control ditch at the 18- <br />Ri ht Ventilation Shaft site. Abated. Ins ected June 14, 2005. 13 June 2005 <br />2a Set back to soil windrows. O lion 2b selected. 13 June 2005 <br />or <br />2b Relocate windrows of to soil to to soil stora a Iles. 7 October 2005* <br />* Was 8 August at the time of inspection, extended to 7 October 2005 on August 4, 2005. <br />Violation CV-2005-006 was issued on May 13, 2005, and modified on May 17, 2005, resulting in four parts. <br />Required abatements of the four parts are described (abbreviated) with required abatement dates indicated as <br />follows: <br />Part Descri lion Abatement Date <br /> <br />1 Redesign/consttuct NW Mains Ventilation Shafr exemption treatment facility 13 July 2005, <br /> extended to <br /> Au ust 11, 2005. <br />2 Include water pumping activity at the 18-Right Ventilation Shaft in the project 13 June 2005, <br /> description. extended to <br /> 30 June 2005, <br /> thence to <br /> 15 July 2005, <br /> thence to <br /> Au ust 11, 2005. <br />3 Include the potential for underground mine water discharges in the description 13 June 2005, <br /> of operations extended to <br /> 30 June 2005, <br /> thence to <br /> 15 July 2005, <br /> thence to <br /> Au ust 11, 2005. <br />4 Demonstrate compliance of discharge with Rule 4.05.2 13 June 2005, <br /> extended to <br /> 30 June 2005, <br /> thence to <br /> 15 July 2005, <br /> thence to <br /> Au ust 11, 2005. <br />C-1982-056 CP Inspection of July 25, 2005, Page 4 of 5 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.