Laserfiche WebLink
III. COMMENTS • COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />(acts or evidence supporting the enforcement action. <br />This was a partial inspection of the Carbon Junction Mine conducted by Tom Kaidenbach of CDMG. No <br />one represented the operator. The gravel operation was active on the site. The ground was dry. <br />Roads <br />The access road remains sevorety eroded as previously noted in the September 2003 inspection report. <br />Hydrologic Balance <br />Pond t was dry. Its embankments were well-vegetated and appeared stable. <br />Backfill and Grading <br />Backfill material composed of clay, sand, and gravel-sized material has been placed in the pit (see Figure <br />1). <br /> <br />w ~ <br />F~ ~~~~ ~ r <br />