My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16870
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:49 PM
Creation date
11/18/2007 9:18:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Inspection
Doc Date
9/27/1993
Doc Name
OSM INSPECTION REPORT
Inspection Date
9/14/1993
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Minesite Inspection Narrative <br />Inspection Date September 14 <br />Mine: Golden Eagle <br />Company <br />Basin Resources <br />14300 Highway 12 <br />Weston, Co. 81091 <br />Individuals present during inspection: <br />Ralph Lopez, Basin Resources <br />Daniel Hernandez, Division of Minerals and Geology <br />Joe Dudash, Division of Minerals and Geology <br />Thomas W. Wright, OSM <br />Weather: sunny and cool <br />Comments <br />This inspection was done to followup on enforcement actions issued by the <br />Colorado Division of Minerals and Geology during the March Federal inspection. <br />A mine identification sign with the required information and perimeter rnarkers were <br />evident on areas checked as were required by Notice of Violation C-93-013. <br />The discharge pipe for pond #003 has been repaired so that the structure can be <br />closed. No discharge was occurring during this inspection. <br />The topsoil stockpile located just below pond #003 had been fenced to prevent <br />grazing as required by Notice of b'iolation C-93-019. <br />During the inspection the upper drainage ditch for the mine access road and two <br />ditches behind the upper parking area were cleaned out. A ditch on tYie access <br />road between topsoil stockpiles #1 and #2 was not properly maintained and as a <br />result Notice of Violation C-93-123 wss issued by the Division of Minerals and <br />Geologywith an abasement deadline of October 1, 1993. <br />Pond #002 was checked and found to have a slight trickle discharging, however it <br />was apparent by the condition of the stream channel below the pond that this <br />structure had been discharging significantly more water earlier that day. According <br />to Mr Lopez water had been pumped from underground and pumping had been <br />stopped because of concern on quality of water discharging from the pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.