Laserfiche WebLink
~- <br />INSPECTION REPORT - PAGE 3 <br />FILE N0. 81-132 - <br />DATE: April 17, 1985 <br />.-. <br />3. Please delineate the total acreage presently disturbed, including the area <br />where overburden (and topsoil) has been removed. <br />4. Please provide "alternative reclamation costs" simulating the possible <br />scenario that mining will not progress at this site. Please calculate <br />reclamation costs as outlined above, including the costs of purchasing and <br />importing topsoil that is adequate to reclaim the area presently disturbed. <br />Such topsoil costs will need to be incorporated into the total amount of the <br />financial warranty, given present site conditions. An alternative plan to <br />acquire appropriate growth medium would also be acceptable. <br />/yt <br />Doc. No. 9606 <br />