Laserfiche WebLink
Page 1 of 1 ~W <br />/~Ja/ <br />~QS <br />Oswald, Bob `%j(a•r~: SvntMI~ $121-(< <br />From: Matt Welte [mrwelte@summitbr~.com] ~/ , <br />7~ . l~R1KS <br />Sent: Thursday, December 28, 2006 10:25 AM <br />To: bob.oswald@siate.co.us '~~~' p~ GGKRc~t 10N <br />Cc: Joe Welte <br />Subject: 8 Mile Clay mine topsoil stabilization <br />Bob, / / <br />The corrective action required by the inspection report of the 8-Mile clay pit (ID # M-1977-320) to stabilize the <br />topsoil stockpile along the road and adjacent to the pit has been completed. This was completed the week of <br />12/17/2006. The date of the inspection was 8/29/2006~The topsoil stockpile was pulled back from the open pit <br />with an excavator and was spread over a greater length along the length of the road to keep it from eroding into <br />the pit. The high wall of soil where erosion was taking place was eliminated in doing so. The topsoil stockpile <br />was also track rolled with a bulldozer to help stabilize the pile. The topsoil stock pile will be seeded with the <br />approved seed mixture from the permit this spring to further stabilize the pile. I have attached pictures of the <br />completed work. Feel free to call me with any questions. <br />Thanks, <br />Matt Welte <br />Summit Brick and Tile Company <br />719-542-8278 RF(,+~A' <br />J l ~® <br />o/~;~ 9N 7 ~ <br />~~,. < p0 <br />M ~ r„ -~ 7 <br />ihi/)~ h.~,~/o <br />~afzryiOn <br />1 /9/2007 <br />