My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16659
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:42 PM
Creation date
11/18/2007 9:17:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
5/22/1998
Doc Name
DMG COAL INSPECTION REPORT
Inspection Date
5/13/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of May, 1998. <br />RECORDS: Records were inspected and found to be in compliance. Further details of the records <br />inspection can be found on page 5 of this report. <br />HYDROLOGIC BALANCE: The site has been without any appreciable moisture for a while and the <br />ponds are starting to dry up. Both ponds had water in them but were not discharging. The <br />ponds are stable and capable of functioning as designed. All culverts and ditches were inspected <br />and found to be clear and capable of functioning as designed. Design changes that have been <br />approved are soon to be implemented <br />GENERAL MINE COMPLIANCE: The site is well maintained and erosionally stable. No problems <br />were noted during the inspection. <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water is diverted <br />off the top and into ditches. Changes to the piles configuration have been approved by the <br />Division and construction is planned to begin in late May or early June. <br />
The URL can be used to link to this page
Your browser does not support the video tag.