Laserfiche WebLink
,, COLORADO DIVISION OF MINERALS AND GE <br />COAL INSPECTION REPORT <br />w /876 ~ <br />MINE NAME: Ohio Creek #2 ADDRESS: <br />OPERATOR: NA <br />PERMITTEE: <br />COUNTY: Gunnison <br />TYPE OF OPERATION: SURFACE UNDERGROUND X LOADOUT <br />OWNERSHIP: FEDERAL X NON-FEDERAL <br />PERMIT STATUS: RV AC=Active, AP=Application in Review, CO=Under Cease Order, <br />IN=Inactive/Phase II Release, PC=Permanent Cessation, RV=Revoked, <br />SU=Suspended, TC=Temporary Cessation, OR=Other <br />[C] MINE ID OR EXPLORATION ID NO. C-80-007 <br />[C] INSPECTION DATE 05/18/06 <br />[C] INSPECTOR'S INITIALS DTM <br />[C] TIME OF DAY (MILITARY TIME) 13:15 <br />[C] INSPECTION TYPE CODE <br />POST INSPECTION CONTACTS <br />JOINT INSPECT. AGENCY CODE <br />CC CC=Coal-Complete, CP=Coal-Partial CX=Coal <br />Exploration, AI=Aerial, IL=Illegal Operation <br />NO NO=None, BL=USBLM, CE=US Corps of <br />Engineers, CH=CoIo Health Dept, CL=CoIo Land <br />NO Board, CT=Citizen, CW=CoIo Wildlife, DE=U.S. <br />Energy, DW=US Wildlife, FS=U.S. Forest Service, <br />HW=CoIo Highway Dept, OS=OSM, SE=State <br />Engineer (Water Resources) <br />[C] REASON FOR INSPECTION CODE IE AG=Other Agency Request, CT=Citizen Complaint, <br />FU=TDN Follow-up, IE=Normal I&E Program, <br />MU=Memo of Understanding, OF=OSM Special Focus, <br />ON=OSM NOV Follow-Up, OS=OSM Oversight, <br />PR=Pre-operational, SI=Surety Release, SR=Surety <br />Related <br />[C] Inspector did did not X receive documents during this Inspection. (If any documents were received, <br />provide a narrative and a list of the documents in Section III of this report.) <br />COMPANY REPRESENTATIVE PRESENT <br />CO. REP. SIGNATURE (FIELD ISSUANCE <br />(uate) <br />INSPECTOR'S SIGNATURE ~ J <br />[C] WEATHER CODE CR CL=Cloudy, C =Clear, FG=Foggy, RN=Raining, <br />SN=Snowing, WD=Windy <br />INSPECTION REPORT ISSUANCE DATE 05/24/06 <br />NOTE: [C] =Required Entry <br />WHITE -File YELLOW -Operator PINK -Specialist <br />