My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16485
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16485
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:17:49 PM
Creation date
11/18/2007 9:16:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
Inspection
Doc Date
11/25/2005
Doc Name
Inspection Report
From
DMG
To
Pathfinder Development Inc.
Inspection Date
10/25/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1994-113 <br />INSPECTION DATE 10/25/05 <br />INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />There were patches of Canada thistle on the topsoil areas, which were not being 12/11/05 <br />controlled. Thistle will damage the topsoil and/or make reclamation more costly. PB or PV: PB <br />TOPIC(S): TS <br />CORRECTIVE ACTION: The operator must develop and submit a weed control plan, as _, _, <br />stated in this report, to be made part of the permit plan through a technical revision (if it <br />is submitted promptly it can be part of the TR-5 currently under review for no additional <br />fee). The weed control plan must also contain a statement committing to timely and <br />correct implementation of the plan. This weed plan must be received by this office by <br />the date shown at right. <br />2. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />3. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />4. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />5. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />CERTIFICATE OF SERVICE <br />I, Bob Oswald, certify that I deposited a true and complete copy of the foregoing document (inspection report) to the addressee <br />at his address of record, with the US Postal Service on the signature date shown below. <br />signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.