Laserfiche WebLink
•~ , w ~ (Page 41 <br />MINE ID # OR PROSPECTING ID # M-79-094-HR <br />INSPECTION DATE 2/27!97 INSPECTOR'S INITIALS WHE <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The inspector noted <br />an the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Pursuant to Rule 4.2.1, DMG will review the current cost of reclamation, based upon conditions <br />of the Reclamation Plan and observations from this inspection. If DMG determines that the <br />existing amount of financial warranty is insufficient to perform reclamation, the operator shall <br />have up to 60 days to post additional financial warranty from the date of written notice from <br />DMG of such insufficiency, as provided by Rule 4.2.1(21. <br />CORRECTIVE ACTION: No response required at this time. <br />/ / <br />PB or PV _ <br />TOPICIS) _ <br />2. / / <br />PB or PV _ <br />TOPICIS) _ <br />3. / / <br />PB or PV _ <br />TOPICIS) _ <br />(end of report) <br />