My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16452
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:17:47 PM
Creation date
11/18/2007 9:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
11/22/1993
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />(Page 3) <br />MINE ID # OR PROSPECTING ID # M-88-112 <br />INSPECTION DATE 11-22-93 INSPECTOR'S INITIALS ACS <br />Materials testing data was examined as part of this inspection. 51 density testa of dam <br />raise materials had been performed to date using a nuclear in-situ density testing apparatus. <br />Glen Guyer stated that he generally did one density teat for each 200 linear feet across the <br />dam. crest; the testa are done at varying depths within each lift. <br />Three proctor testa had been conducted on dam raise material, all three running in the <br />neighborhood of 125 pcf maximum dry density. <br />Gradation testing of the screened liner cover material indicates that it is running <br />approximately 12 percent fines (material passing a #200 sieve) with some samples running up <br />to 20 percent fines. <br />East mine pit reclamation was observed from a vantage point on a hill south of the Rito Seco. <br />The east pit was back-filled with west pit overburden. Grading and cont~~uring of the back- <br />fill has resulted in slopes that blend with the surrounding hills. StabLlizing grasses are <br />well established on the reclaimed elopes; establishment of the native species included in the <br />seed mix will take more time, probably several growing seasons. <br />Sampling of the groundwater monitoring wells at the San Luie Project was discussed with Alana <br />Scott, Environmental Engineer at the mine. The decontamination procedure for the sampling <br />equipment includes transporting the sampling equipment back to a fresh water tap between <br />sampling episodes and running soapy water through the pump and tubing, as well as a fresh <br />water rinse of all sampling equipment. The Division should audit the well sampling and de- <br />con procedures at some future date when an inspection can be coordinated with a sampling <br />event. <br />No problems or possible violations were noted during this inspection. <br />I 6 E Contact Address <br />NAME <br />cc: Larry Oehler, DMG <br />Jim Stevens, DMG <br />STREET <br />CITY/STATE/ZIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.