Site Inspection <br />The Loadout north of Northgate was inspected and no concerns were noted. There <br />was 2 to 3 inches of wind blown snow. The area was well vegetated, was properly <br />signed. The gate was down. There are two piles of scrap, one broken telephone <br />poles, pipe about 10'X20'X2', the other pile looked like it was still usable 12"X12" <br />some about 20' long. This material must be removed as part of the reclamation. <br />The Mlne site was inspected and no problems were noted. There were several inches <br />of snow on the ground. Snow formed drifts in low areas and on the lee side of the <br />shrubs. The gate was locked and the entrance was properly signed. <br />Comments Page 2 <br />