Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Edna Mine conducted by Tom Kaldenbach ofthe Colorado Division of <br />Minerals and Geology. No one else was present. More than a foot of snow cover prevented access into the <br />site and, therefore, the inspection was limited to observations made from the perimeter of the site. <br />The Division recently issued a proposed decision to approve bond release application SL-8 for a Phases I, <br />II, and III partial bond release for the Goat Trail road and the former conveyor corridor. <br />With the operator's consent, this report was issued from the Denver office. <br />Support Facilities <br />No problems were found in the Oak Creek facilities azea. <br />Slides and Damaee <br />Reclaimed slopes in the Moffat, Center ]ridge, and West Ridge areas were observed from County Road <br />29. The Goat Trail was observed from Highway 131. Slopes were snow-covered and appeazed stable. <br />3 <br />