Laserfiche WebLink
(Page 3) <br /> 7. Mr. Hill expressed an interest in closing out the pit as soon as possible. The matter of a partial warranty release was <br /> discussed. Currently, the operator would qualify for a release of reclamation responsibility for all pit walls that have <br /> been graded to a 3:1 slope, topsoiled, and revegetated; and all pit Floor areas that have been topsoiled and <br /> revegetated. Release for these completed tasks can be accommodated via submittal of a request for release of <br /> reclamation responsibilities for these areas in conformance with the requirements of Rule 4.16 (please see attached <br /> copy). This inspector recommends the operator include in the release request a map delineating these areas and <br /> their respective acreages. <br /> 8. In order for the operator to be released from reclamation responsibilities for other portions of the pit floor, the <br /> operator will need to either topsoil and revegetate such areas or submit a modification to the reclamation plan for <br /> these areas. The Division is willing to consider other methods of stabilization for these areas provided they are <br /> compatible with the post-mining land uses. Following stabilization according to the approved plan, those areas can <br /> then be considered for release of reclamation responsibility. The operator is encouraged to contact the Division if <br /> further clarification is needed for these concerns. <br /> I & E Contact Address <br /> NAME: Carl V. Hill <br /> OPERATOR: Bestway Paving Company <br /> STREET: 131 N. 35th Avenue„ P.O. Box 3189 <br /> CITY/STATE/ZIP: Greeley. CO 80634 <br /> cc: Carl Mount, DMG (via E-mail) <br /> Attachments <br />