Laserfiche WebLink
DMG AVAILABILITY OF RECORDS <br />MINE: HAMILTON <br />DATE: 10/02/01 <br />FILE NO.: C-91-078 <br />QUARTER: 3RD <br />ON SITE? PERMIT RECORDS ON SITE? HYDROLOGIC RECORDS <br />02/10/02 •DMG Permit _30 Jun 02 •NPDES Petmit <br /> •Permit Application w/Revisions _2ND •NPDES Records <br />~ •Findings Document ~ •Stormwater Management Plan <br />06/01/02 •Insurance Certificate ~ •SPCC Plan <br /> •Bond Document NA •MSHA Pond Inspections <br />~ •Phased Bond Release Doc. &Findings _NA •State Engineer's Pond Inspection <br />_NA_ •Air Emission Permits 2ND _ •Quarterly Pond Inspections <br />_NA •County Special Use Permits _2000*_ •Annual Hydrology Reports <br />NA •UG Mining Landowner Notification * Ground Water Monitoring <br />_NA_ •Subsidence Monitoring Reports * Surface Water Monitoring <br />NA •Subsidence Monitoring Data * Spring & Seep Monitoring <br />J •Rill and Gully Survey * Mine Water Discharge Monitoring <br /> •Vegetation Monitoring Da[a * Mine Inflow Study <br />NA_ •Specific Variance Approvals * Water Consumption Records <br />_2000_ •Annual Reclamation Reports ~ •Well Permits <br /> •Mid[erm Review Documents <br />~ •DMG/OSM Inspection Reports/ ON SITE? BLASTING RECORDS <br /> Enforcement Actions (3 years) <br />~ •Transfers/Succession of Operator NA •Blasting Publication <br />NA _ •Temporary Cessation Notification NA_ •Blasting Records (3 years) <br />~ •Reclamation Cost Estimate NA •DMG Permit to Use and Store <br /> Explosives <br />ON SITE? CERT~ICATIONS NA •Blasting Variances <br /> _NA •Pre-Blast Surveys <br />~ •Pond Certifications <br />NA _ •Annual Certs. for Impoundments (Lg) ON SITE? ADDITIONAL RECORDS <br />NA _ •Fill Stability Certifications for <br /> Excess Spoil or Underground <br /> Development Waste <br />NA _ *Quarterly Inspections <br />NA _ * Compaction Testing <br />NA * Final Certification <br />NA _ •Coal Processing Waste Banks <br /> •Haul Road Certifications <br /> •Access Road Certifications <br /> CO MMENTS <br /> Hydrologic monitoring has been temporarily su spended until two years prior to Phase 3 Bond Release. <br /> <br /> <br /> <br />