My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16014
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:17:21 PM
Creation date
11/18/2007 9:13:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/16/1994
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sUN15-1994 14:26 1=RR~]'1 HEIJDERSOIJ MILL TO HNDRSIJ 2ND ZR P.03 <br />JI <br /> <br />_(_ <br />highl weathered rack, except at ono end'of a seismic profile where <br />the w thared'zano is thin. l <br />The project area is free f~om recorded seismic activity, both <br />~o-'~ historical and recent. According to the ~nifOrm Building Code, the <br />site is on 2 t:order1 of Zone 0 and Zone I indicating that only <br />minor damage tc light constructed structures should be crxpected. <br />PRIt1ARY CRUSHIAIG PLAh1 <br />Proposed Construction <br />Fs currently planned, the primary crushing plant will he lo- <br />Gated Haar Coordinate Location B-0, a. shown on Fiyuro 1. A rein- <br />forced concrete structure is planned with a Uottom level a, shown <br />on Figure d. The top 35± feet cf ttir., crusher will be rect;3ngular <br />i <br />in cross-section, about 84 by 112 feet in plan dimension, with 'the <br />long dimension parallel to the conveyor centerline. The laver <br />portion of the structure is planned akxiut SO feet in diameter by <br />90± feet deep. A conveyor will transfer tt~e crushed ore from be- <br />Heath the prir.~ary cru:~her, at the l~.~vcl shown on figure d, up Le <br /> <br />the west on a 41:1 alopc to the cear~e ore storage buildincl. We <br />understand the crusher would exert a pressure on the order of <br />10,000 psf on foundation materials beneath a mat foundation. The <br />upper 35± feet of ttiu crusher excavation is planned as open cut, <br />as sho~.;•~ or. ~ig~:re 0; and may remain open I'or at least one ~~ear. <br />o000'~~' Agri-Cl2l'F. KCi r< h AS>fX'lA 7'ES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.