Laserfiche WebLink
Below are comment on the inspection. Ths comment Include discussion of <br />observations made during the inspection. Comment also describe any <br />enforcement actions taken during the inspection and the fact or evidence <br />supporting the enforcement action. <br />Thia was a perlial iavpectian ooodrrcoed by Jaaet Bites of CDMG. Mr. Ron Thompson, repces~ng <br />Pidrotwme P~ooess;ng LLC, met the inspectcsr m site far dre inepectim. Weather was cloudy, rainatarm <br />was threatmiog. General area has been moeivmg monsoon weather patterns of heavy aRanoon <br />thtmdastorms. Read had damp spots. <br />the inspection commenced at the Refuse Disposal Area (RDA). Piclcetwbe graded, topeoiled, seeded, <br />mulched s~ mated, the 3°° bench, an the tdwe pr7e recently in 1999. The netting is well anchored at <br />the top of the elope. Anneals are ac6vdy growing m dre tec]aimed slope and are emerging throagh the <br />netting. Mulch cover is iemeinrog an the stops and there tens no sigm of erosional feattaes. Perennial <br />species noted m the ieelaimed ores include Amaicm vetdr, wrmtarfat, PeoMamm, and Wood's rose. <br />Slope is holding up well, and 100 year ditches along the perimeter of the slope ore holding wee <br />PicJretwue hes graded a ditch immediately north a~f the completed slope TLis ditch is fimaianing wall, <br />and water is diverted away 5nom the pile tone and i~o the aide ep-rapped drainages. <br />Repairs to the Farad S riser have been completed. Bentonite and sediment material has mt been re- <br />spreadaverthespillway pipe A steal pipe has bees mated with the CMP epillvvay pipe. The <br />oormectian locatiam have been welded to®etlrrr. Visually this loot ip be a good seal No space was <br />visible between the matching of the pipes. Water levels was blow the pipe level ao no was <br />ooamrog. <br />West Portal area was inspected with ngpid to the portal bsddll settling. game additiaml of <br />the repeQ fill materiel has aaamed. Appraetimstdy, l R vertical a~ffset has aoamed in about a 8 R <br />diameter area. )t is not appetmt if water is piping down this sealed area or not. <br />Rainstorm began an site at the close of the imcpectim. <br />